A topnotch siding project takes time and planning. While the actual installation can be done within a week or two, there are other aspects that can factor in, such as the size and style of your home and whether the siding needs to be painted.
And then there are other unforeseen issues that can crop up and cause delays, such as damage discovered underneath the existing siding as it is removed.
A great siding contractor will address all of these areas with you during your consultation, but it is a good idea to be a prepared consumer and understand all the important aspects of beautifying your home with new siding.
Things That Might Impact Your Siding Installation
Timeline for Siding Installation Can Vary
Because every home is unique, even the most experienced siding company may discover unforeseeable problems as the process unfolds. These issues can sometimes create additional costs or extend the timeline of the project. Since siding boosts home value, it’s important to do the work right.
Asbestos and Other Toxic Substances
Some houses constructed prior to 1979 may contain a fire-retardant, toxic material called asbestos. Professional siding companies can determine whether there is asbestos in material, and if so, help you figure out next steps.
Another issue that could crop up in old homes is the use of lead paint. If you suspect lead paint may have been used in your home, discuss it with your siding contractor.
Wood Rot
Wood rot is something most homeowners don’t suspect until existing siding is removed and the problem is discovered. At this point, delays can occur as necessary repairs are made before new siding is installed.
Ruined Sheathing
Another issue experts may find when removing old siding is that the sheathing under the original siding is damaged. Additional time will be required to fix the sheathing and do the job right in order to avoid future problems.
Other Damage
Once siding is removed, other issues may be discovered, such as pest infestations. If an area of the home’s exterior requires immediate repair, it could impact the project’s cost and timeline.
Painting
If your siding requires painting, you’ll need to budget additional days for the installation project so that the paint job is done properly.
The Weather
Nobody can predict bad weather, but it is a factor you must be ready to accept if it should arise. Clear weather is needed to ensure your siding installation is done well.
10 Things You Can Do to Prepare Your Home for New Siding
- Discuss with your contractor how shutters and downspouts could be affected. If they need to be removed, make sure it’s understood how and when they will be reinstalled.
- Mow the lawn the shortest height possible to make it easier for the contractor to recover any loose nails or staples after the project is complete.
- Remove any unnecessary items away from your house, such as lawn and garden equipment, patio furniture, potted plants, and toys.
- Inside the home, remove pictures, shelves, or anything else of value from the walls to avoid damage from falling.
- Installation is a loud undertaking. To avoid any undue stress or anxiety, make arrangements for pets and children, and consider working away from home.
- If children and pets remain at home during installation, for safety, stay aware of their whereabouts at all times.
- Provide a clear power outlet for the crew, preferably a 20-amp outlet for power tools.
- Prepare room for a dumpster that will be delivered to dispense of all related debris. Some municipalities or homeowner associations require permits, so discuss this with your contractor in advance.
- Park your vehicles an appropriate distance from your house to reduce the chances of damage being done during the installation.
- Trim trees and shrubbery away from the home.
Steps Your Contractor Will Take to Install Your Siding
Old Siding Removal
Before your new siding can be installed, your old siding must go. Professional crews may temporarily cause a mess but will constantly use the dumpster to keep things as tidy as possible.
Wall Preparation
Once the siding is removed, the integrity of the wall beneath it will be assessed. Rot, sheathing issues, water damage, and other needed repairs will be addressed. New siding can only be correctly installed if your home’s walls are in sound condition.
Insulation Installation
When the old siding is torn down, any old insulation will also be removed. Fresh insulation appropriate for the new siding is then put in place, providing that protective barrier from loss of air and heat.
Last but not least, the new siding is installed, safeguarding your home from the elements and giving your home’s exterior a lovely, stylish look.
Cleanup
Cleanup is actually the last step, and it’s extremely important. Conscientious siding crews will remove any leftover debris and wash any dust or grime off the installed boards, leaving your home exterior spotless and gorgeous.
Things to Discuss with Your Siding Installation Contractor
Any project as big as siding installation requires a certain amount of communication before, during, and after the project. To set expectations, be sure to discuss:
- Start and stop times
- Anything the crew should be extra careful around, inside or outside your home
- Requests to avoid loud music
- Parking
- Any other concerns you have
Get to know your contractors and the foremen associated with the work, in case anything during the project needs to be addressed. This shows mutual respect and can make any delicate issues easier to handle along the way.
Love Your Home with New, Low Maintenance Siding
You deserve a beautiful, long-lasting home that gives you peace of mind. So, when you’re in need of new siding, get it installed by the star team at John McCarter Construction. See why homeowners in Michigan love our work, and reach out to us to learn how we can give your home a facelift you’ll be proud of.